Forest

New Energy Case Studies.

Explore our portfolio of successful new energy projects implemented for clients worldwide. These case studies demonstrate our expertise in delivering high-quality, reliable new energy solutions tailored to our clients’ specific needs..


Case Study 1: 500kW Rooftop Solar System – Commercial Office Building, Germany

Client: Real estate development company in Berlin, Germany
Project Requirements: Reduce electricity costs for a 10,000 sqm commercial office building, achieve sustainability targets
Solution: 500kW grid-tie rooftop solar system with 1250 x 400W monocrystalline panels, 500kW central inverter, remote monitoring system

Results:
· Annual electricity generation: 525,000 kWh
· Annual cost savings: €85,000
· Carbon emissions reduction: 370 tons per year
· Payback period: 5.2 years


Client Feedback: “Siyunjo provided excellent support throughout the project, from design to commissioning. The system has been performing above expectations, helping us meet our sustainability goals while significantly reducing our operating costs.”

7 8 1024x683

Case Study 2: 1MWh Energy Storage System – Manufacturing Facility, Australia

Client: Food processing plant in Melbourne, Australia
Project Requirements: Reduce peak demand charges, provide backup power during frequent grid outages
Solution: 1MWh lithium iron phosphate battery energy storage system, 500kW PCS, integrated with existing 300kW solar system

Results:
· Peak demand charges reduced by 40%
· Provides 8 hours of backup power for critical operations during outages
· Annual cost savings: AUD 180,000
· Payback period: 3.8 years


Client Feedback: “The energy storage system from Siyunjo has been a game-changer for our business. We no longer suffer production losses from grid outages, and our electricity costs have dropped significantly. The team provided excellent support during installation and commissioning.”

20 2 1024x683

Case Study 3: Off-Grid Wind-Solar Hybrid System – Remote Village, Kenya

Client: Non-governmental organization working on rural electrification
Project Requirements: Provide reliable electricity to a remote village of 500 households with no grid access
Solution: 50kW solar array, 2 x 10kW wind turbines, 200kWh battery storage system, 100kW inverter, distribution network for the village

Results:
· 24/7 electricity supply for 500 households, a school, and a health clinic
· Enabled the use of electric lighting, refrigeration for medicine, and small business operations
· Improved quality of life and economic opportunities for the village


Client Feedback: “Siyunjo’s off-grid solution has transformed this village. The system has been operating reliably for over 2 years, even in harsh weather conditions. The team’s expertise in designing systems for remote locations was invaluable to the project’s success.”

13 7 1024x576

Case Study 4: 1MW/2MWh Solar+Storage Microgrid – Island Resort, Maldives

Client: Luxury resort operator in the Maldives
Project Requirements: Replace expensive diesel generation with renewable energy, reduce operating costs, achieve sustainability targets
Solution: 1MW solar PV array, 2MWh lithium-ion battery storage system, 1.2MW hybrid inverter, integrated with existing diesel generators

Results:
· Diesel consumption reduced by 75%
· Annual cost savings: USD 450,000
· Carbon emissions reduction: 1,200 tons per year
· Payback period: 4.5 years


Client Feedback: “The microgrid system from Siyunjo has allowed us to significantly reduce our operating costs while enhancing our sustainability credentials, which is very important to our guests. The system has been operating flawlessly since commissioning.”.

8 11 1024x576
Forest

Want to discuss your next renewable energy project? Contact claire@siyunjo.com for a free consultation and preliminary system design

滚动至顶部